Park Plaza

 

20160728_092645_(Mobile)

   

130 East Main Street

Park Plaza is located south of Main Street between Cherry Street and Prairie Street (130 E Main St.). Redevelopment of Park Plaza and adjacent parking lot were identified as a priority project in the Downtown Development Plan approved by Galesburg City Council in 2016. The plaza was constructed in the 1970s and is currently in need of major repairs.  The renovation project began in February 2017 when Council approved proposals from Massie Massie & Associates and Bruner, Cooper & Zuck for design and construction management services. Since that time, a steering committee was assembled and met multiple times to discuss the design, a workshop was held with City Council for input and a public meeting was held on site for community input. Construction drawings are currently under development and the City hopes to begin the project in 2018.
 
 
Join Our Mailing/Alert List
Follow Us: Facebook Twitter RSS
CITY OF GALESBURG KNOX COUNTY ILLINOIS
City of Galesburg; 55 W. Tompkins Street; Galesburg, IL 61402-1387|Phone: 309-343-4181|Directions|Contact Us|Intranet
©2018 City of Galesburg.|Web site design and development by Americaneagle.com|Privacy Policy|Terms & Conditions|Site Map